Company: Basra Oil Company
Contractor: Pars Kayhan Co.
Field: 24" Gas Pipeline From Basra To Najaf
Duration: 2016 - 2019
Scope: The scope included the installation of reinforcement concrete pit (5x4x3.9 m) for the ESDV on the 24" pipeline from Basra GTU to Najaf PS3 at every 25 km.
Loaloat Shat Al-Arab LSA was formed to provide services to the expanding Petroleum Industry needs in the South Region of Iraq. Because of our strong belief in the future of the Petroleum Industry in the Region LSA has continued to mobilize resources. We are acutely aware personnel are the foundation of a company. We have worked diligently to staff LSA with personnel committed to exceeding industry standards in their assigned disciplines. Our technical staff works hand in hand with our HSE and QA/QC Managers to produce quality work in a safe work environment. Because of our staff, we feel LSA is building on a very solid foundation. We at LSA are committed to the continuation of providing quality completed Projects safely, on schedule, and within budget to our valued clients.